Conference Call with Chris Scott Hanson
March 20, 2002 12:00-1:00
Present: John, Stephanie, Greg, Chris
1) Budgets
Chris has not yet done them. John reminded him of the 3 types of budgets that
we're looking for. Chris said that he will get them out to us ASAP, but no later
than next Tuesday the 26th.
2) Feasibility
-Feasibility begins once the Purchase and Sale (P&S) is signed.
-The project management contract with Cohousing Resources begins when the Purchase
and Sale is signed.
-Chris' experience is that feasibility takes 60-90 days, and costs between $15-35,000.
It all depends on how much testing we need and want to do.
-He does plan to look into the pesticides/toxins/chemicals that may be in the
soil. Greg brought up several points about this testing and feels that we could
do some preliminary research for MUCH less cost than $5-$20k. This would include
simply finding out who the current farmers are and asking them what chemicals
they've used during their farming. Greg thinks it is very likely that we'll
find some contamination in the soil, and he can help the group understand what
they mean and what levels are safe.
---Chris said that we could probably begin this initial soil research and testing
on our own AFTER 3/31/02. He will ask the owner for the name of the current
farming tenants so we can contact them. We need to stay away from the land until
3/31 because we don't want to give away our interest in the land until the contract
is up.
3) Price
-Greg asked why the price isn't higher? Chris said that's a good question, but
he believes that it is a combination of things: (1) the majority of the land
is industrial and is land locked (no access to the road) and there really is
no market for that much industrial land right now, (2) the part of the land
that is usable as residential dwellings is small (10 single detached dwellings)
so that isn't a big selling point, (3) the land owner isn't very savvy and probably
doesn't know how to make this land worth more (i.e. 40b).
4) Land Owner
-Chris is somewhat concerned that he hasn't heard back from the landowner in
about 3 weeks despite *numerous* attempts to reach him by phone, email, and
letter. He doesn't really know what to make of this, but it could be that the
owner has been out of town (as he is frequently), or has had a death in the
family.
-Chris *does* think the owner is very serious about wanting to sell the property
and knows that WE are serious about wanting to buy based on his long conversation
with the owner a few weeks ago.
-One troubling point - after Chris spoke to the owner on the phone at length,
he called back about 48hrs later without any memory of the previous conversation.
-Chris gave us the name of the company that the owner works for, and the name
of another company mentioned by him, so that we can research and give Chris
the company's contact information so Chris can try to reach him at work.
5) Chris' Schedule
4/2 arrives by plane at midnight
4/3 plans to meet with the landowner (not yet confirmed, but the owner said
he is generally available on Tuesday and Wednesdays)
4/4 - 4/8 available to meet with us.
4/7 has very tentative plans with JP in the afternoon, but we said we'd really
like for him to come to our general meeting that afternoon if he can. He said
he'd make an effort to arrange his schedule in order to do so. We need to pick
an alternate date to meet with him, however.
4/8 fly out
6) Misc
We talked with him a bit about the specifics of the streamlined development
model and what that means in terms of our capital requirements. He thought it
might be a good idea to have a sub-meeting with folks that need/want to review
the development model with him while he is out here next. We agreed that that
would be an excellent idea. Need to schedule this as well.
7) Conference Call
Wednesday 3/27 at 12:00 Eastern Time
|
Last
modified:
March 20, 2002
|